Zenett Project Recovery
Stalled, part-built, inherited or adaptive reuse.In ten weeks you know what to do with it.
What you have, what it is worth and the way forward, set out in writing before you commit another dollar.
Who it is for
Anyone holding a building somebody else started.
Owners and estates
A project that has stopped, or one you inherited and did not set up.
Lenders
A funded project that has stalled and a loan that depends on finishing it.
Receivers and liquidators
A part-built asset to finish or sell, with the facts to support either.
Buyers
A project coming out of receivership, and the need to know what you are buying.
Existing structures
An old frame to keep and build around: access, fire, floor heights, deflection.
Taking over a part-built project is not the same job as starting one. The person running it must have done it before.
Goran Iliev, Founder & DirectorThe path
Two steps in ten weeks. You can stop after the first.
Verify
What exists, what it cost, and who stands behind it.
- Site inspection with an independent engineer
- Approvals, certification and insurance position
- Contract, payments and the value gap
- Assessment of the builder and the consultants
Analyse and Decide
Every realistic option, costed side by side.
- Finish and hold, finish and sell, redesign, or sell as is
- Market and revenue view from selling agents
- Cost to complete and programme for each option
- A written recommendation
Deliver
The building finished, certified, titled and settled.
- Builder reset or replacement
- Documentation of the works to complete
- Contract, certification and construction
- Through to settlement, or the sale of the site
What you hold at the end
Five documents that answer the question.
Value Gap Report
What has been paid against the fair value of what is on site.
Idle Site Cost Schedule
What the stalled site is costing every week, and what can stop now.
Verification Report
The state of the building, the approvals, the insurance, the contract and the builder.
Feasibility Pack
One model per option, with the cash still required and the return on it.
Decision Report
Our recommendation, the immediate steps, and a price for the next phase.
Ten weeks, four milestones
A fixed fee, paid against reports in your hands.
Share of the fee at each milestone: 9%, 51%, 30%, 10%.
First findings
Information register live, site inspection report, idle site costs, services and utilities status.
Verification Report
The full verified position and the first workshop. You may stop here.
Feasibility Pack
Market, finishes, works to complete, cost plans and programmes for each option.
Decision Report
The recommendation, the second workshop, the next-phase proposal and the full record handed over.
Our terms
The risk sits with us first.
Nothing payable in advance.The first invoice follows the first reports, and it is the smallest.
Stop after Verify.Pay for the first two milestones only.
You keep everything.Every register, report and model is yours, organised and indexed.
No obligation to continue.With Zenett or with anyone else.
We have done this before
What a structure hides, and how it gets finished.
Taken over at structure after three builders.
The building had stood in the weather through three changes of contractor. It was surveyed and investigated before any completion work was priced, then taken through to certification, titling and settlement.
What the structure was hiding
Remedial works on Waterline cost more than ten times the allowance. That is why we verify before anyone prices the finish.
Hotel to apartments, Rushcutters Bay
A hotel stripped to its columns and floors and rebuilt as 101 apartments: a 3D survey of the frame, carbon-fibre strengthening, and floor level corrections throughout.
Two recoveries at a time
Have a stalled or part-built project? Talk to us.
Zenett Pty Ltd · Property Development Execution · De-risk decisions. Control execution. Deliver with certainty.